Modify an A/P Document Date
1. Change System Settings to allow the A/P Document Date to be modified.
Prior to actually changing the document date, there are a couple of settings that need to be enabled to allow a User to change the date.
- System Configuration (enables the system to allow the change globally)
- User Access Levels (allows specific Users to have access to this permission)
1.1. System Configuration setting
- Navigate to Administration ➤ System Configuration and find the Accounts Payable Group (hint: it's at the top of the list!)
- Double-click the setting for Allow AP Doc Date Change and set the Value to True.
- Click OK to save the System Configuration settings.
2. Open the View AP Aging window
Now that the settings have been changed to allow the ability to modify the A/P Document Date, you can proceed to the A/P Aging window.
- Navigate to Accounts Payable ➤ View AP Aging.
- Double-click to open the A/P Document that you want to change the date for.
3. Change the Document Date
- You can see the Document Date in the Reference section in the upper-left.
- You can see the Due Date in the Document Info section in the upper-right.
Either of these dates can be changed by simply typing a new date and then clicking OK to save.
The Document Date you see here is the same as the Voucher Date from the original Voucher.